Skip to content
AMA OdishaExam · ଆମ ପରୀକ୍ଷା

Time & Work

ସମୟ ଓ କାର୍ଯ୍ୟ

16 min · Mathematics (Class 10 level)

Odia video explainer

Time & Work

The animated Odia explainer for this lesson is being produced. Read the notes below meanwhile.

In this lesson, you will learn Time & Work for Odisha ASO Paper II Mathematics. We will cover the basic formula, efficiency, combined work, alternate-day work, and pipes/cisterns type questions. The main idea is simple: convert time into work rate per day, then add or subtract rates.

You will learn

  • ✓Understand the relation between work, time, and efficiency.
  • ✓Solve questions where two or more persons work together.
  • ✓Use LCM method to avoid fractions in Time & Work.
  • ✓Handle negative work such as leakage or destruction.
  • ✓Identify common traps in OPSC-style MCQs.

Core Formula

In Time & Work, we measure how much work is completed in one unit of time.

Basic relation:

Work = Rate × Time

If A completes a work in x days, then A’s 1 day work is:

1/x

If A and B work together:

Combined 1 day work = A’s 1 day work + B’s 1 day work

So, time taken together:

Total work ÷ Combined rate

Example idea:

  • A finishes a job in 10 days.
  • A’s 1 day work = 1/10.
  • B finishes it in 15 days.
  • B’s 1 day work = 1/15.
  • Together 1 day work = 1/10 + 1/15 = 1/6.
  • So together they finish in 6 days.

Solved Question

Question: A can complete a work in 12 days and B can complete it in 18 days. In how many days will they complete the work together?

Step 1: Take LCM of 12 and 18.

LCM = 36. So assume total work = 36 units.

Step 2: Find daily work.

PersonTimeWork per day
A12 days36/12 = 3 units
B18 days36/18 = 2 units

Step 3: Add daily work.

A + B = 3 + 2 = 5 units/day

Step 4: Time = Total work ÷ Daily work

Time = 36 ÷ 5 = 7.2 days

So, answer = 7.2 days or 7 days 1/5 day.

LCM Shortcut

For ASO MCQs, the LCM method is the fastest.

Steps:

  1. Take LCM of given days.
  2. Treat it as total work.
  3. Divide total work by each person’s time.
  4. Add or subtract daily work.
  5. Divide total work by net daily work.

Memory trick:

D → L → R → T

  • Days given
  • LCM as total work
  • Rate per day
  • Time required

This avoids long fraction calculations like 1/12 + 1/18.

Important Patterns

PatternWhat to doExample logic
A and B togetherAdd rates1/A + 1/B
A works, B destroysSubtract ratesA’s rate − B’s rate
Pipe fills, leak emptiesSubtract ratesFilling rate − leakage rate
More efficiencyMore work per dayFaster completion
Alternate daysCalculate cycle workDay 1 A, Day 2 B, repeat
Men increasedWork rate increasesMore workers usually take less time

Key point: Time and efficiency are inversely proportional.

If efficiency doubles, time becomes half. If efficiency becomes half, time becomes double.

Alternate-Day Work

Question: A can finish a work in 10 days and B can finish it in 15 days. They work on alternate days, starting with A. In how many days will the work be completed?

Take LCM of 10 and 15 = 30 units.

A’s 1 day work = 30/10 = 3 units. B’s 1 day work = 30/15 = 2 units.

In 2 days, they complete:

A + B = 3 + 2 = 5 units.

In 10 days, they complete:

5 cycles × 5 units = 25 units.

Remaining work = 30 − 25 = 5 units.

Day 11: A works and completes 3 units. Remaining = 2 units.

Day 12: B can do 2 units in one full day, so B finishes it on Day 12.

Answer = 12 days.

If remaining work is less than one day’s capacity, use fraction of day.

Common Traps

Avoid these mistakes:

  • Do not add days directly. If A takes 10 days and B takes 15 days, together they do not take 25 days.
  • In leak or destruction questions, subtract the rates.
  • In alternate-day questions, check who starts first.
  • If a person leaves after some days, split the work into two parts.
  • If the question asks for efficiency ratio, do not confuse it with time ratio.

Important relation:

If A takes 6 days and B takes 12 days, then A is faster.

Efficiency ratio A : B = 1/6 : 1/12 = 2 : 1.

So, time ratio is inverse of efficiency ratio.

How OPSC Asks This

In ASO Paper II, Time & Work questions are usually short and calculation-based. Expect:

  • A and B together type.
  • A, B, C combined work.
  • One person leaves after some days.
  • Pipes and cisterns with leakage.
  • Efficiency and wages sharing.

Because there is negative marking of 0.25, do not guess if calculations are unclear. Use the LCM method and check whether the answer is reasonable. Together work should usually take less time than each person alone, unless there is negative work like a leak.

Odisha Angle

Time & Work can be linked to real situations in Odisha, such as road repair, paddy harvesting, school building painting, or tube-well repair.

Example:

A group of workers can repair a village road in 12 days. Another group can do the same work in 18 days. If both groups work together, the work will finish in less than 12 days.

Using LCM method:

Total work = 36 units. First group per day = 3 units. Second group per day = 2 units. Together = 5 units/day. Time = 36/5 = 7.2 days.

This type of practical wording is common in Class 10-level arithmetic.

Quick revision

  • ★If a person completes work in x days, 1 day work is 1/x.
  • ★For combined work, add individual work rates.
  • ★For leakage or destruction, subtract the negative work rate.
  • ★LCM method is the fastest for MCQs.
  • ★Time and efficiency are inversely proportional.
  • ★If A is twice as efficient as B, A takes half the time of B.
  • ★In alternate-day work, calculate cycle work first.
  • ★Together time should usually be less than individual times.
  • ★For wages, divide money in the ratio of work done.
  • ★Never add the number of days directly.

Practice questions

Tap an option — you'll see the answer and explanation instantly.

Q1.A can complete a work in 20 days and B can complete the same work in 30 days. In how many days will they complete it together?

Q2.A can do a piece of work in 15 days. B is 50% more efficient than A. How many days will B take to complete the work?

Q3.A and B together can complete a work in 8 days. A alone can complete it in 12 days. How many days will B alone take?

Q4.A pipe can fill a tank in 6 hours and a leak can empty it in 9 hours. If both are open, in how many hours will the tank be filled?